September 2022 Update
Construction is underway and expected to be complete before November 2022. Expect some temporary traffic closures while our team completes the work.
This project includes:
- 2 raised crosswalks (1400 West, Backman Elementary crosswalk),
- traffic circle at 1300 West / 500 North,
- raised islands (lane narrowing) at 1200 West,
- several upgrades to pedestrian ramps / crosswalks,
- 2 speed feedback signs (and 20 MPH speed limit).
Stay alert to changes in traffic patterns and stop signs at intersections.
- The intersection of Oakley St / 500 North will be changed from an all-way stop to 2-way stop (north & south stop).
- The intersection of 1200 West / 500 North will be changed to an all- way stop.
La construcción está en marcha y se espera que esté terminada antes de noviembre de 2022. Se prevén algunos cierres temporales de tráfico mientras nuestro equipo completa las obras.
Este proyecto incluye:
- 2 pasos peatonales elevados (1400 Oeste, Paso Peatonal de la Escuela Primaria Backman),
- rotonda en 1300 Oeste / 500 Norte,
- isletas elevadas (estrechamiento de carril) en 1200 Oeste,
- varias mejoras en las rampas/pasos de peatones,
- 2 señales de indicación de velocidad (y límite de velocidad de 20 MPH).
Manténgase alerta a los cambios en los patrones de tráfico y a las señales de alto en las intersecciones.
- La intersección de Oakley St / 500 Norte cambiará de un alto en todas las direcciones a un alto de 2 vías (alto norte y sur).
- La intersección de 1200 Oeste / 500 Norte cambiará a un alto en todas las direcciones.
Project Background
In response to concerns from area residents, Salt Lake City is planning to implement traffic calming strategies on 500 North between Redwood and 1200 West.
For a neighborhood street, 500 North has unusually high vehicle traffic, which has associated speeding and safety issues. In 2018 a child from the neighborhood was hit by a vehicle and tragically did not survive. This is not acceptable. We know that reducing the speed of vehicles can substantially reduce the probability of serious injury or death in auto / pedestrian collisions.
In recent months the City built a lane narrowing feature near the Jordan River Parkway trail crossing. We are actively considering other modifications that include neighborhood gateway signs, raised crosswalks, and curb extensions that improve pedestrian safety while accomplishing traffic calming objectives.
Proposed 500 North Corridor Improvements
Proposed 500 North Corridor Improvements
How is this project being funded?
This project was made possible by funding from City Council, which allocated a portion of Salt Lake City’s share of Transportation Funding from the County’s Quarter-Cent Sales Tax. The funding provides approximately $270,000, a substantial amount of funds for traffic calming features. Still, it is well below the cost of reconstructing the street or addressing the overall pavement condition. This project will focus on spot improvements added to the corridor that slow vehicle speeds and provide dual benefit of improving pedestrian crossings.
Project Timeline
Spring 2021Project Announcement Late Spring 2021 Input on Draft DesignSpring/Summer 2022Final DesignFall 2022Construction
Contact Us
Project Manager | Kyle Cook
Email | [email protected]
Social Media | @SLCmoves @SLCgov
Share «500 North Traffic Calming» to your social network:
PORTFOLIO COMPANIES DISPLAYED ON THIS PAGE ARE NOT NECESSARILY REPRESENTATIVE OF ALL INVESTMENTS IN VEHICLES MANAGED BY 500 STARTUPS MANAGEMENT COMPANY, L.L.C. (TOGETHER WITH ITS AFFILIATES, “500 GLOBAL”) AND THERE CAN BE NO ASSURANCE THAT THE INVESTMENTS WILL BE PROFITABLE OR THAT OTHER INVESTMENTS MADE IN THE FUTURE WILL HAVE SIMILAR CHARACTERISTICS OR RESULTS. THIS LIST INCLUDES CURRENT AND FORMER 500 GLOBAL PORTFOLIO COMPANIES WHICH HAVE BEEN ACQUIRED AS WELL AS COMPANIES WHICH HAVE UNDERGONE AN INITIAL PUBLIC OFFERING, AND MAY INCLUDE COMPANIES THAT ARE NO LONGER OPERATING OR HAVE CHANGED SECTOR, REGION OR TECHNOLOGY. SOME UNICORNS AND CENTAURS IN THE 500 GLOBAL PORTFOLIO HAVE NOT PUBLICLY DISCLOSED THEIR VALUATIONS AND ARE NOT LISTED ON THIS PAGE. THIS LIST IS UPDATED PERIODICALLY AND AS SUCH MAY NOT REFLECT RECENT 500 GLOBAL INVESTMENTS. PAST RESULTS OF 500 GLOBAL INVESTMENTS, POOLED INVESTMENT VEHICLES, OR INVESTMENT STRATEGIES ARE NOT NECESSARILY INDICATIVE OF FUTURE RESULTS. THE SECTOR, REGION AND TECHNOLOGY CATEGORIZATIONS SHOWN ON THIS PAGE HAVE BEEN MADE BY 500 GLOBAL, ARE SUBJECT TO CHANGE AND MAY NOT ALIGN WITH INDUSTRY STANDARDS OR THE CHARACTERIZATION OF OTHER INVESTORS OR THE COMPANIES LISTED ON THIS PAGE. NO CONTENT ON THIS PAGE SHOULD BE CONSIDERED AS AN OFFER TO SELL OR SOLICITATION OF INTEREST TO PURCHASE ANY SECURITIES, CONSTRUCTED AS FUND MARKETING MATERIALS BY PROSPECTIVE INVESTORS CONSIDERING AN INVESTMENT INTO ANY 500 STARTUPS FUND, OR USED AS THE BASIS FOR ANY INVESTMENT DECISIONS. ALL LOGOS, NAMES, AND TRADEMARKS OF THIRD PARTIES REFERENCED HEREIN ARE THE TRADEMARKS AND LOGOS OF THEIR RESPECTIVE OWNERS. ANY INCLUSION OF SUCH TRADEMARKS OR LOGOS DOES NOT IMPLY OR CONSTITUTE ANY APPROVAL, ENDORSEMENT OR SPONSORSHIP OF 500 GLOBAL BY SUCH OWNERS.